What must appear on an invoice
Numbering, dates, identifiers, VAT and totals: the checklist, with country specifics.
Clear, checked explanations of the job behind the tools: invoicing, VAT, construction estimates.
Numbering, dates, identifiers, VAT and totals: the checklist, with country specifics.
ICE, IF, taxe professionnelle, VAT and total in words: the checklist for a compliant Moroccan invoice.
No VAT, ICE, turnover tax and ceilings: what to put on your invoices and what to watch.
Content, validity, deposit, approval and conversion to an invoice: the method for clear, binding quotes.
Quote → purchase order → delivery note → invoice: what each document proves and when to issue it.
Net to gross, gross to net, several rates, rounding: the formulas with examples.
Two percentages that look alike but are not: formulas, multiplier, pricing for a target margin and a worked example.
Target income, expenses, taxes, billable weeks and hours: the method to find a rate that really pays you, with an example.
Permit, VAT thresholds, TRN, tax invoices, corporate tax and pricing: the essentials for UAE freelancers.
Clear payment terms, polite then firm reminders, formal notice and late interest: the method to get paid without losing the client.
Net area, blocks per m², mortar, cement bags and waste: the method with an example.
Volume, waste margin, cement dosage, sand, gravel and water: the method to order the right quantities, with an example.
Wall area, openings, coats, coverage and waste: the method to buy the right number of cans, with an example.
Area, tile and joint size, waste margin and boxes: the method to order enough tiles from the same batch, with an example.
Weight per metre by diameter, total length, laps, waste and 12 m bars: the method to order reinforcing steel, with an example.
Area, thickness, waste, cement dosage, sand and water: the method to order the materials of a sand and cement screed, with an example.
Work items, take-offs, costs, overheads, contingency and margin: the complete method with formulas, a worked example and the costliest mistakes.
Total rise, number of risers, riser height, tread depth and Blondel’s formula: the complete method with formulas, two examples and common mistakes.
Length, width and depth, working space, swell and truck capacity: the method to estimate earthwork volumes and loads, with a worked example.
Net area, coat thickness, waste margin, then mortar, cement and sand: the method to order the right quantity of render, with a worked example.
Boarded area, stud spacing, track and screws: the method to count the materials of a metal-stud partition, with a worked example.
Span, width, joist spacing, rows of blocks, mesh and topping: the method to order a joist-and-block floor, with an example.
Frame and leaf profiles, glass, door sheets, shutter slats, extruded weight and cladding: the method to order, with an example.
Timber volume and lengths, board sheets, glass and the cutting plan: the method to order wooden joinery, with an example.
Runs, cabinet module, corner units, worktop, plinth, cap and hood: the method to order a kitchen, with an example.
Concrete, formwork, pours, stripping and reinforcement by mark for a column, footings and a beam, with a worked example.
Slope area, tiles or sheets, battens or purlins, rafters and ridge: the method to order a roof, with an example.
Excavation, gravel, backfill, geotextile and pipes of a drainage trench: the method, with an example.
Pavers with joints, sand bed, base, excavation and kerbs of a paved area: the method, with an example.
Capacity, excavation, concrete, formwork, steel and lining of a buried box: the method, with an example.
Area, boards or tiles, furring or grid, hangers and consumables: the method to order a suspended ceiling, with an example.
Area, panels with waste, fixings, adhesive and vapour barrier: the method to order thermal insulation, with an example.
Overall dome size, kerb concrete and formwork, waterproofing turned up the kerb, sealant and fixings: the method, with an example.
Frame tube, infill bars, posts, weight, tubes to buy and surface to paint: the method to order metalwork, with an example.
Points, average runs, circuits and cable tray: the method to order the material of an electrical installation, with examples.
Pipe lengths, waste, bars, fittings, clips and the drop of a drain: the method to order plumbing material, with examples.
Length, height, blocks, footing, pillars, coping and panel fence: the method to order a boundary, with examples.
Length, section, concrete, formwork and steel of the small reinforced elements of masonry, with examples.
Net area, volume in place, swell, weight and truck loads: the method to plan the removal of rubble, with examples.
Area, piece size with joints, waste, adhesive, grout, boards and packs: the method to order a covering, with examples.
Bays, lifts, frames, braces, decks, guardrails, jacks and ties of a frame scaffold, with an example.
Bags, sand, gravel, labour against price, pump and delivery: the method to compare two ways of supplying concrete.
Share of the surface, replacement tiles, plaster, paint and primer: the method to order a repair, with examples.