How to compare site-mixed and ready-mixed concrete

Updated October 16, 2026

A pour can be mixed on site or delivered ready-mixed. The cheaper option depends on your own prices, which no tool can know. This guide shows the method; the figures in the example are illustrative, typed for the example, and are not market prices.

1. Cost of a site mix

Cement bags: the cement per m³ times the volume, divided by the weight of a bag and rounded up, times the price of a bag. Add the sand and the gravel (their volume per m³ of concrete times the volume of the pour, times their price per m³) and the mixing labour per m³.

2. Cost of ready-mixed concrete

The price per m³ times the volume, plus the pump if one is needed and the delivery charge, which is often a fixed amount.

Worked example with illustrative prices: 10 m³

Mix of 350 kg of cement, 0.45 m³ of sand and 0.85 m³ of gravel per m³. Prices typed for the example: bag 60, sand 180 per m³, gravel 220 per m³, labour 120 per m³; ready-mixed 900 per m³, pump 800, delivery 300:

  • Cement: 10 × 350 / 50 = 70 bags × 60 = 4 200.
  • Sand 4.5 m³ × 180 = 810. Gravel 8.5 m³ × 220 = 1 870. Labour 10 × 120 = 1 200.
  • Site mix: 8 080, i.e. 808 per m³.
  • Ready-mixed: 10 × 900 + 800 + 300 = 10 100, i.e. 1 010 per m³. Difference 2 020.

What the comparison leaves out

It compares costs only. Quality control, workability, the strength class, the delay, storage on site and the equipment you have are for you and the engineer to weigh. A small pour may not justify a delivery charge; a large one rarely suits a site mixer.

Why no prices are built in

Prices change with the place, the supplier and the date. The tool uses the ones you type, so the result reflects your own situation and nothing is guessed.

General information, checked at the date shown. It does not replace advice from a professional for your situation.

Tools for this guide

BUILNORA

Reinforced Concrete

Column, footings and beam: concrete, formwork with or without, pours, stripping and bars by mark, stirrups, starter bars and meshes.

Other guides

How to calculate VAT

Net to gross, gross to net, several rates, rounding: the formulas with examples.

BUILNORA

How to price a construction quote

Quantities, materials, labour, overheads and margin: the method to price a job and send a quote that protects you.

BUILNORA

How to count aluminium joinery

Frame and leaf profiles, glass, door sheets, shutter slats, extruded weight and cladding: the method to order, with an example.