Skip to content

Site Mix vs Ready-Mixed Concrete (cost comparison)

Enter the volume of the pour and the proportions of your site mix, then type your own prices: the cement bag, the sand and the gravel per m³, the mixing labour, and for ready-mixed concrete the price per m³, the pump and the delivery. PRAXAO gives the bags to buy, the total and the cost per m³ of each option, and the difference between them. No price is built in: nothing appears until you have typed them. The example figures are illustrative, not market prices. The tool compares costs: it does not choose a concrete class or weigh quality, workability or delay.

m³
kg/m³
kg
EUR
m³/m³
EUR
m³/m³
EUR
EUR
EUR
EUR
EUR

Result

Fill in the fields to see the result.

Your last inputs are kept in this browser.

Results are provided for information. Check tax rates and legal requirements that apply to you.

How to use it

  1. Enter the volume of concrete.
  2. Check the mix proportions of your site mix (cement, sand and gravel per m³).
  3. Type your prices: bag, sand, gravel, labour, and the ready-mixed price, pump and delivery.
  4. Read the total and the cost per m³ of each option, and the difference.

Examples

Worked example (illustrative prices) — Volume of concrete 10 m³

Cement bags to buy: 70 · Total cost, site mix: 8080.00 · Cost per m³, site mix: 808.00 · Total cost, ready-mixed: 10100.00 · Cost per m³, ready-mixed: 1010.00 · Ready-mixed minus site mix (positive: site mix is cheaper): 2020.00

Frequently asked questions

Which prices does it use?

Only those you type. None is built in or guessed, so the comparison reflects your own suppliers and your own site.

Does it say which concrete is better?

No. It compares costs. Quality, workability, the strength class, the delay and the equipment on site are for you and the engineer to weigh.

How are the cement bags counted?

The cement per m³ times the volume, divided by the weight of a bag and rounded up to a whole bag.

Guides to go further

Next step

BUILNORA

Reinforced Concrete

Column, footings and beam: concrete, formwork with or without, pours, stripping and bars by mark, stirrups, starter bars and meshes.

BUILNORA