60 m³ of sand at 1.6 t/m³, 10 km, 10 t truck with an 8 m³ body
Weight: 96.00 t. By payload: 10 trips; by body volume: 8 trips; the payload fills first, so 10 trips. One round trip takes 65 minutes (30 km/h, 15 min loading, 10 min unloading): 7 round trips a day for one truck, i.e. 2 days. At a quoted 400 per trip: 4,000.00.