5 m × 2.5 m partition, one door, both faces
Boarded area 21.22 m²; with 10 % waste and 1.2 × 2.5 m boards: 8 boards, 10 studs at 60 cm, 10 m of track and 531 screws at 25 per m².
Choose a partition or a suspended ceiling and enter the dimensions: PRAXAO counts the boards with cutting waste, the vertical studs and floor-and-ceiling track (or the furring channels) and the screws.
Enter the dimensions to see the drawing.
Fill in the fields to see the result.
Preliminary estimate from the values entered: not a structural validation and not an execution plan. Check the local rules and the manufacturers’ data.
Your last inputs are kept in this browser.
Results are provided for information. Check tax rates and legal requirements that apply to you.
Boarded area 21.22 m²; with 10 % waste and 1.2 × 2.5 m boards: 8 boards, 10 studs at 60 cm, 10 m of track and 531 screws at 25 per m².
One stud every 40 or 60 cm centre to centre plus one at the end, as set by the system you use. Add the extra studs around doors according to its data sheet.
No. It counts boards, studs, track or channels and screws. Joint compound, tape, insulation and specific fire, acoustic or moisture boards depend on the system.
Cuts around openings and at the ends leave offcuts. 10 % suits simple rooms; use more when there are many cut-outs.
Boarded area, stud spacing, track and screws: the method to count the materials of a metal-stud partition, with a worked example.
Area, boards or tiles, furring or grid, hangers and consumables: the method to order a suspended ceiling, with an example.
How much paint you need for your walls and ceilings, minus doors and windows, for the number of coats you plan.
Mortar volume, cement bags and sand to plaster or render walls from the area, thickness and waste.
Labour cost of a task from the quantity, your productivity and the hourly wage: hours, days, cost per unit.