12 m × 2.6 m wall, 4 m² of openings, 15 mm
Net area 27.2 m²; with 15 % margin, 0.469 m³ of mortar, 164 kg of cement (5 bags of 35 kg) and 657 kg of sand at 350 kg/m³ and 1,400 kg/m³.
Enter the wall dimensions or the area, the number of faces and the thickness: PRAXAO calculates the mortar to prepare, the cement (in bags) and the sand for your mix, with a margin for waste and uneven walls.
Enter the dimensions to see the drawing.
Fill in the fields to see the result.
Preliminary estimate from the values entered: not a structural validation and not an execution plan. Check the local rules and the manufacturers’ data.
Your last inputs are kept in this browser.
Results are provided for information. Check tax rates and legal requirements that apply to you.
Net area 27.2 m²; with 15 % margin, 0.469 m³ of mortar, 164 kg of cement (5 bags of 35 kg) and 657 kg of sand at 350 kg/m³ and 1,400 kg/m³.
A single cement coat is often 10 to 20 mm. Walls that are not plumb need more, and several coats are used above about 20 mm.
Rough masonry absorbs mortar and part is lost while working. 10 to 25 % is common; adjust it to your wall.
Those products have their own consumption per m² and per mm, given on the bag. Use the manufacturer’s figure for them.
Net area, coat thickness, waste margin, then mortar, cement and sand: the method to order the right quantity of render, with a worked example.
Boarded area, stud spacing, track and screws: the method to count the materials of a metal-stud partition, with a worked example.
Blocks or bricks, mortar and cement bags for a wall, with openings deducted and a breakage margin.
How much paint you need for your walls and ceilings, minus doors and windows, for the number of coats you plan.
Volume of floor screed and the cement bags, sand and water needed for your area and thickness.
Plasterboard sheets, studs, track, furring channels and screws for a partition wall or a suspended ceiling.