20 m² at 5 cm
5 % margin: 1.050 m³ of screed, 368 kg of cement (8 bags of 50 kg), 1,470 kg of sand and 210 L of water.
Enter the floor area and the screed thickness: PRAXAO calculates the volume to prepare with a margin, and the cement (in bags), sand and water for the mix you set.
Enter the dimensions to see the drawing.
Fill in the fields to see the result.
Preliminary estimate from the values entered: not a structural validation and not an execution plan. Check the local rules and the manufacturers’ data.
Your last inputs are kept in this browser.
Results are provided for information. Check tax rates and legal requirements that apply to you.
5 % margin: 1.050 m³ of screed, 368 kg of cement (8 bags of 50 kg), 1,470 kg of sand and 210 L of water.
About 3 to 5 cm for a bonded screed and 5 to 7 cm for a floating screed on insulation. Follow the requirements of your floor covering.
Traditional cement screeds are often mixed at 300 to 350 kg of cement per m³. Ready-mixed products have their own data sheets.
For self-levelling compounds sold in bags, use the manufacturer’s consumption per m² and mm instead.
Net area, blocks per m², mortar, cement bags and waste: the method with an example.
Volume, waste margin, cement dosage, sand, gravel and water: the method to order the right quantities, with an example.
Number of tiles and boxes for a floor or wall, with grout joints and a cutting waste margin.
Column, footings and beam: concrete, formwork with or without, pours, stripping and bars by mark, stirrups, starter bars and meshes.
Prepare a clear quote or estimate for your client, with validity date, taxes and totals, ready as PDF.