Skip to content

Facade Scaffolding Quantities (frames, decks, ties)

Enter the length and the height of the facade, the bay length and the lift height of your system, and how many working levels carry decks. PRAXAO gives the bays and the lifts, the frames, the braces, the decks, the guardrails, the base jacks and the tie anchors. The bay length, lift height, braces, decks, rails and the area served by a tie are starting values to replace with the supplier’s system data. The tool counts components: it does not design the scaffold or check its load class, stability or tying pattern, which belong to a competent person.

Dimensions

m
m
m
m
m²

Enter the dimensions to see the drawing.

Calculation results

Fill in the fields to see the result.

Preliminary estimate from the values entered: not a structural validation and not an execution plan. Check the local rules and the manufacturers’ data.

Your last inputs are kept in this browser.

Results are provided for information. Check tax rates and legal requirements that apply to you.

How to use it

  1. Enter the length and the height of the facade.
  2. Enter the bay length and the lift height of your scaffold system.
  3. Enter the working levels, and replace the starting values (braces, decks, rails, area per tie) with the supplier’s data.
  4. Read the components to hire or buy, then price them in the cost panel.

Examples

Worked example — Length of the facade 20 m, Height to reach 9 m, Working levels (with decks) 3

Facade area covered: 180.00 m² · Bays: 8 · Lifts (levels): 5 · Frames: 45 · Braces: 40 · Decks: 24 · Guardrails: 48 · Base jacks: 18 · Tie anchors: 15

Frequently asked questions

Does it design the scaffold?

No. The design, the load class, the stability, the tying pattern and the inspection belong to a competent person under the regulations in force.

How are the frames counted?

There is one more frame line than bays, and one frame per lift: frames = (bays + 1) × lifts, with the bays and the lifts rounded up.

What are the working levels?

The lifts that carry a deck for people to work on. Only those get decks and guardrails in this count.

Guides to go further

Next step

BUILNORA

Labour Cost Calculator

Labour cost of a task from the quantity, your productivity and the hourly wage: hours, days, cost per unit.

BUILNORA

Material Transport Calculator

Truck loads, haulage days and cost to deliver a volume or weight of material from the truck payload and the distance.

BUILNORA

Paint Calculator

How much paint you need for your walls and ceilings, minus doors and windows, for the number of coats you plan.