Garage slab
5 × 4 m slab, 12 cm thick, 5 % waste: 2.52 m³ to order; at 350 kg/m³, 882 kg of cement, i.e. 26 bags of 35 kg.
Estimate how much concrete to order for a slab, a footing or columns, including a waste margin. PRAXAO also works out the cement (and number of bags), sand, gravel and water from a mix you can adjust to your recipe or your supplier.
Fill in the fields to see the result.
Your last inputs are kept in this browser.
Results are provided for information. Check tax rates and legal requirements that apply to you.
5 × 4 m slab, 12 cm thick, 5 % waste: 2.52 m³ to order; at 350 kg/m³, 882 kg of cement, i.e. 26 bags of 35 kg.
30 cm diameter, 3 m high: 0.848 m³ before waste.
Length × width × thickness, in metres. A 5 × 4 m slab, 0.12 m thick, needs 2.4 m³, before adding a waste margin.
It depends on the element and the required strength. Follow your plans, the engineer’s specification or the product data sheet; PRAXAO uses the dosage you enter.
They are estimates from the mix per m³ you set. Densities and recipes vary; confirm with your supplier, especially for ready-mixed concrete.
Uneven ground, formwork deformation and spillage consume extra concrete. Running short during a pour is far more costly than a small surplus.
Number of tiles and boxes for a floor or wall, with grout joints and a cutting waste margin.
How much paint you need for your walls and ceilings, minus doors and windows, for the number of coats you plan.
Prepare a clear quote or estimate for your client, with validity date, taxes and totals, ready as PDF.